Delhi Metro Map Route

Green Line

Mundka Industrial Area to Vasant Vihar Metro Route

~52 mins54 (approx.)26 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Mundka Industrial Area Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Vasant Vihar Metro Station

GateExit / Location
1Main Exit

Along this route

Shorter trips from Mundka Industrial Area toward Vasant Vihar

Continue from a stop to Vasant Vihar

From a connected station to Vasant Vihar

Reach Vasant Vihar from a station directly connected to it.