Green Line
Mundka Industrial Area to Peera Garhi Metro Route
~14 mins₹32 (approx.)7 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Green Line
Platform 2 • Gate 1
Destination • Gate 1
Gate / Exit – Mundka Industrial Area Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Peera Garhi Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Peera Garhi → Mundka Industrial AreaAlong this route
Shorter trips from Mundka Industrial Area toward Peera Garhi
From a connected station to Peera Garhi
Reach Peera Garhi from a station directly connected to it.