Delhi Metro Map Route

Green Line

Mundka Industrial Area to Uttam Nagar East Metro Route

~40 mins43 (approx.)20 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Mundka Industrial Area Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Uttam Nagar East Metro Station

GateExit / Location
1Main Exit

Along this route

Shorter trips from Mundka Industrial Area toward Uttam Nagar East

From a connected station to Uttam Nagar East

Reach Uttam Nagar East from a station directly connected to it.

Lines on this route