Pink Line
South Extension to Shadipur Metro Route
~22 mins₹32 (approx.)11 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Pink Line
Change Train
Blue Line
Gate / Exit – South Extension Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Shadipur Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Shadipur → South ExtensionAlong this route
Shorter trips from South Extension toward Shadipur
- South Extension → Dilli Haat INA
- South Extension → Dhaula Kuan
- South Extension → Durgabai Deshmukh South Campus
- South Extension → Delhi Cantonment
- South Extension → Naraina Vihar
- South Extension → Mayapuri
- South Extension → Rajouri Garden
- South Extension → Ramesh Nagar
- South Extension → Moti Nagar
- South Extension → Kirti Nagar
From South Extension to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Shadipur
Reach Shadipur from a station directly connected to it.