Delhi Metro Map Route

Blue Line

Mayur Vihar Phase-1 to Tagore Garden Metro Route

~36 mins43 (approx.)18 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Mayur Vihar Phase-1 Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Tagore Garden Metro Station

GateExit / Location
1Main Exit

From Mayur Vihar Phase-1 to a connected station

One stop away on the network — useful for nearby trips or first/last mile.

From a connected station to Tagore Garden

Reach Tagore Garden from a station directly connected to it.

Lines on this route